![]() |
Place a continuous bead of adhesive caulk along the top edge of the Better-Bench at wall surface. Apply stiff mortar to completely fill bench unit,allowing for surface drainage by building mortar up in back corner and screeding even with upper front lip of unit. Pack mortar tightly, allowing the mortar to press through the front holes. Fill any voids in front channel and screed mortar flush with upper and lower lip of channel. |